Interior Painting Project for 220,000 sq ft. VA Clinic

CertaPro Painters® of Highlands Ranch, CO was contracted to help with a large interior painting project for the Veterans Affairs Clinic Building in Colorado Springs, CO.  The scope of the project included interior painting for all three stories, nearly 220,000 sq ft. and painting for 400 door frames. The project took 7 weeks to complete, and all work was done between 3:30pm and midnight to minimize disruption of day to day operations of the building. All three floors including offices, clinical spaces, and common areas were painted.

CHALLENGES:
The building was only about 7 years old when the project was done, however due to the heavy traffic the building sees every day the interior surfaces were showing signs of wear. Some of the interior walls were in need of drywall repairs, which was included within the scope of the project. This project was also done during the COVID-19 pandemic and protocols were followed to ensure that workers and visitors to the facility were safe.

CONDITIONS:

Overall the building was relatively new and in good shape. Many interior surfaces were starting to show signs of wear and tear from the high level of traffic within the building.

PROJECT INVOLVEMENT:

We painted all walls, door frames, some ceilings, completed drywall patches in some of the common area hard ceilings. We also installed new FRP on the walls of approximately 30 exam rooms

PROJECT TIMELINE – 7 weeks

AFTER PHOTOS

Below are photos of a few sections of the building after the project was completed.

Interior Painting For All 3 Floors

Interior Painting For All 3 Floors

The project was a total of 7 weeks. All work was performed between 3:30 pm & 12:00 midnight

Lobby Area After Painting

Lobby Area After Painting

This interior painting project included three stories totaling 220,000 sq ft & 400 door frames

Updated Interior Surfaces

Updated Interior Surfaces

The building was only about 7 years old when we did the project. The interior surfaces we well used due to the large volume of traffic the building sees everyday.

Interior Offices & Hallways

Interior Offices & Hallways

We painted all walls, door frames, some ceilings, completed drywall patches in some of the common area hard ceilings.

Updated Exam Rooms

Updated Exam Rooms

Some of the exam rooms had new FRP on the walls installed as part of the project.