Montessori Children's House & School

in Richardson, TX

Ready to make a change?

Schedule an Estimate

School Painting Case Study

This project was for the Montessori Children’s House & School located on Abrams Road in the Lake Highlands neighborhood of Dallas. The project was to repaint all the previously painted interior surfaces, including all the cabinets and children’s cubbies in all the classrooms, as well as all the exterior doors. This was our inaugural project in a new commercial relationship with Home Pro and it was Home Pro’s first large commercial project since they mainly manage residential home improvement projects for their customers.  It was critical for them that the job goes smoothly and it was critical to us to maintain excellent customer service with our clients.

Condition of Facility:

As you can imagine, hundreds of preschool children can deliver a lot of wear and tear to surfaces.  Also, the customer was very unhappy with the previous painting on the interior doors (streaky and stipple marks from poorly brushed and rolled doors) and wanted their appearance improved dramatically, so considerable prep was required on all the doors.

Project Involvement:

  • Drywall Replacement – due to water damage and mold.
  • Heavy Duty Sanders – to work on doors.
  • Ceiling Working Platform – One ceiling was suspended over another ceiling so the painters had to build a working platform on top of the first ceiling in order to paint th

Special Challenges:

Timing. The job had to be completed during the school’s Christmas break.  The window was tight given the scope of work involved.  Also, the degree of prep on the doors was unusually heavy due to the customer’s desire to have them look dramatically smoother. In addition, we had to work around heavy furniture, such as pianos and fish tanks, while meticulously painting around these pieces so as to not get paint on them.

Project Timeline: 10 Days

Before Photos

Below is what the interior of the school looked like prior to painting. Click on any image to zoom in.

Another Look at Condition of Classroom

Another Look at Condition of Classroom

Another Look at the Classroom Before Painting

Another Look at the Classroom Before Painting

Before Look at the Cubby Area

Before Look at the Cubby Area

Before Look at the Office Spaces

Before Look at the Office Spaces

Previous Photo of Classroom

Previous Photo of Classroom

School Classroom Before Photo

School Classroom Before Photo

Work In-progress

Bringing in the Material

Bringing in the Material

Cabinets Being Painted Gray

Cabinets Being Painted Gray

Covering the Freshly Painted Cubbies

Covering the Freshly Painted Cubbies

Cubbies Being Repainted

Cubbies Being Repainted

Important to Cover the Glass

Important to Cover the Glass

In Progress Painting of Classroom

In Progress Painting of Classroom

In-Progress Photo of Painting Doors

In-Progress Photo of Painting Doors

Prepping the Cabinets

Prepping the Cabinets

Prepping the Space

Prepping the Space

One of Our Crew Painting the Trim

One of Our Crew Painting the Trim

Our team Repainting the Walls

Our team Repainting the Walls

After Photos

Below are the final results of this commercial painting project.

Cubbies Repainted

Cubbies Repainted

Door Repainted to Match Trim

Door Repainted to Match Trim

Final Result of Cabinets Repainted

Final Result of Cabinets Repainted

Here's a photo of cabinets that got repainted in the Montessori's school.

Results of School Walls Repainted

Results of School Walls Repainted

Trim and Ceiling Repainted

Trim and Ceiling Repainted

Walls and Ceiling Repainted with a Clean Finish

Walls and Ceiling Repainted with a Clean Finish