High School Gym Transformation Case Study

CertaPro Painters® of Homewood and Kankakee County, IL

Ready to make a change?

Schedule an Estimate

Revitalizing Manteno High School Gym 

In June 2024, CertaPro Painters® of Homewood and Kankakee County, IL, embarked on a transformative project at Manteno High School’s gym in Manteno, IL.The facility, suffering from cracked and peeling paint, was in dire need of a complete makeover. Our team of skilled painters took on the challenge of rejuvenating this essential space, recognizing its importance to the school community.

Over the course of 11 days, we meticulously painted the entire ceiling, refreshed the steel doors, and applied two coats of paint to the walls, ensuring a vibrant and durable finish. Utilizing an aerial lift for daily operations, we ensured a thorough and professional job.

This project not only restored the gym to its former glory but also provided a renewed environment for students and staff to enjoy.

Highschool Gym

Highschool Gym Painting Project (Progress Photo)

 

Project Overview:

Franchise: CertaPro Painters® of Homewood and Kankakee County, IL
Location: Manteno, IL
Project Type: Commercial Case Study
Facility: High School Gym
Project Duration: 11 Days
Completion Date: June 2024

Initial Condition of the Facility:

The Manteno High School gymnasium was in dire need of a makeover. The paint on the walls and ceiling had deteriorated significantly, with noticeable cracks and peeling paint. The facility’s appearance was outdated, impacting the overall aesthetics and atmosphere of the gym.

Scope of Work:

The project involved a complete transformation of the high school gym. The main tasks included:

  • Painting the entire ceiling to restore its pristine look.
  • Repainting steel doors to ensure durability and a fresh appearance.
  • Applying two coats of high-quality paint on the walls for a smooth and lasting finish.

Special Challenges:

There were no significant challenges encountered during the project, allowing for a smooth and efficient completion.

Special Equipment Used:

To ensure the highest quality and safety, an aerial lift was used daily. This equipment was essential for accessing high and hard-to-reach areas of the gym ceiling.

Project Execution and Results:

The project was meticulously planned and executed over 11 days. The CertaPro Painters® team worked diligently to ensure minimal disruption to the school’s activities. By using top-tier paints and following best practices, the gym’s appearance was significantly improved. The fresh coats of paint on the walls, ceiling, and doors not only enhanced the gym’s aesthetic appeal but also contributed to its longevity and maintenance.

The transformation of the Manteno High School gymnasium is a testament to CertaPro Painters® of Homewood and Kankakee County, IL’s commitment to excellence in commercial painting. The project was completed on time, within budget, and to the highest standards, leaving the school administration and students highly satisfied with the new, vibrant look of their gym.

Before Images

Below are images of the project before we started. Click to enlarge.

Gym Floor (Before)

Gym Floor (Before)

Gym Rear (Before)

Gym Rear (Before)

Highschool Gym Ceiling (Before)

Highschool Gym Ceiling (Before)

Time For A Change?

Ready to transform your space with our professional painting & carpentry services? Contact CertaPro Painters® of Homewood and Kankakee County, IL today to discuss your project and schedule a consultation. We look forward to bringing beauty and craftsmanship to your home or business.

Schedule Your Free Estimate Today! Back

During Images

Below are images of the project as it was taking place. Click to enlarge.

Gym Floor Prepped And Progress Being Made

Gym Floor Prepped And Progress Being Made

Progress On The Ceiling

Progress On The Ceiling

Ceiling Painting in Progress

Ceiling Painting in Progress

Great quality work with professional results, what more could you ask for!

- John M | Manteno, IL

John M | Manteno, IL

Get a Free EstimateBack

After Images

Below are images of the project after we finished. Click to enlarge.

High School Gym (After)

High School Gym (After)

High School Gym Ceiling (After)

High School Gym Ceiling (After)

Bleacher Side Of The Gym (After)

Bleacher Side Of The Gym (After)

Other Commercial Services That We Offer

Areas We Serve Near Homewood and Kankakee County, IL