PROBLEM TO BE SOLVED:

The paint was chipping and pealing all over the walls and ceiling. The ceiling had stains from a previous leak.

PROJECT INVOLVEMENT:

This project required a huge amount of scraping and priming. The original paint was oil-based which required a large amount of scaling.

CHALLENGES, EQUIPMENT AND TECHNIQUES:

The interior had very high ceilings and a sanctuary that was full of pews. The scaffolding was built to roll between the isles. A large amount of skimming and sanding was required. We refinished all the pews as well. We used a Festool sander and dust collector to help contain all the dust created by sanding the pews.

FINAL RESULT:

The project started in the summer of 2020 and took 3 weeks to complete.

Photos can be seen below of how the church looked before and after the team got to work.

Before

Before

Before

Before

Preparation

Preparation

Preparation

Preparation

Work in Progress

Work in Progress

After

After