Commercial Case Study

North Coast Tire in Independence, OH

Ready to make a change?

Schedule an Estimate

PROBLEM TO BE SOLVED:

The exterior block walls had peeling paint that needed to be scraped and removed.

PROJECT INVOLVEMENT:

After scraping away all loose and peeling paint a prime coat was needed to keep the remaining paint from bubbling.

CHALLENGES, EQUIPMENT AND TECHNIQUES:

The condition of the walls made it a challenge to create a smooth finish. Scraping, priming and several topcoats were needed for a satisfactory finish. Some masonry work was needed to prep the surface for painting.

FINAL RESULT:

The project started in August of 2021 and was completed over one weekend.

Photos of how the building looked before and after the team got to work can be seen below!

Before

Before

Before

Before

Before

Before

After

After

After

After

After

After