Basement Painting Project in Herriman, Utah

The basement had been finished out over a period of 2 years by the homeowner. They requested our services for the final touch, paint. The homeowner’s family members had started priming portions of the space.

The project included priming and painting the trim work, doors, and walls of about 1,500 square feet. We filled holes, caulked, prepped and painted a main living room, 3 bedrooms, 3 closets, and the staircase area.

Project Details

The Job Site Supervisor and team arrived on time as stated in a preparation phone call.  The team performed extensive cleaning before prepping the areas to be painted.  The team taped off the entire basement area from the main living space to contain the dust and fumes that were generated.

We were able to spray the doors and surfaces because the space was empty of furniture.  The second coat of paint was applied by spraying, then back rolling to ensure complete coverage of the textured walls.

The homeowner chose to use semi-gloss paint on the ceilings to help bounce light around the rooms.  This varies from the standard flat paint that would normally be used.  Sherwin Williams Agreeable Gray was used on the walls.
Spraying and Backrolling

Before Photos

Click each for a larger view of the project space before we started work.

Staircase Prep

Staircase Prep

Room Before

Room Before

Main Room Before

Main Room Before

Den Before

Den Before

In Progress

The team worked diligently to complete repairs, prep and painting. Click each in progress image for a larger view.

Staircase Fully Prepped

Staircase Fully Prepped

Spraying Den

Spraying Den

Spraying and Backrolling

Spraying and Backrolling

Spraying First Coat

Spraying First Coat

Prepping Main Room

Prepping Main Room

Sanding and Priming

Sanding and Priming

Prepping the Room

Prepping the Room

Main Room Prep Work

Main Room Prep Work

Main Room Prep Work

Main Room Prep Work

Prep Room Den

Prep Room Den

Back Rolling Second Coat

Back Rolling Second Coat

Back Rolling Second Coat

Back Rolling Second Coat

After

The Job Site Supervisor walked the project and completed touchups before performing a final walk through with the client. The client had zero call outs upon completion.

Staircase Finished

Staircase Finished

Staircase Finished

Staircase Finished

Staircase Finished

Staircase Finished

Finished Room

Finished Room

Finished Room

Finished Room

Finished Den

Finished Den

Finished Den

Finished Den