Challenges
Challenges involved on this job revolved around coordinating street closings for equipment use, areas that were close to power lines or tight areas to reach with lift and other structures.
CONDITIONS
All metal surfaces and siding colors had faded due to sun light, they were aged and in need of a refresher coat.
PROJECT INVOLVEMENT
- Preparation – Project involved some large lifts, small siding repair, & Painting
- Painting – Project required multiple lifts ranging in sizes of 60′ to 80′ in order to paint the exterior of the building
PROJECT TIMELINE – April 2020
DURING PHOTOS
During the project, CertaPro Painters® of Lexington, KY team took pictures of the exterior of the building,
THE FINAL RESULT
Once the project was complete, CertaPro Painters® of Lexington, KY gathered images of the updated exterior of the building.