Madeira High School Locker Rooms

Featured Commercial Project

Ready to make a change?

Schedule an Estimate

Painting the Facility

We were contracted to paint the locker rooms at Madeira High School in Cincinnati, Ohio. The locker rooms and parts of the hallway areas needed some brightening up, and a fresh coat of paint is always a great solution. The prep work included spot priming and full priming certain areas, along with wiping down the door and trim.

A Good-As-New Locker Room

In addition to the mentioned prep work, we also removed all of the loose and peeling paint from the metal deck ceiling, supports, trusses and l-beam supports. We then applied two coats to multiple areas: walls (painted over the stencils and graphics), drywall ceilings and bulkheads, concrete and metal deck ceilings, doors, door frames, and painted window casings. The result is a locker room that looks as if it were just built, ready for years of use.

Madeira High School Locker Rooms

Madeira High School Locker Rooms