Residential Case Study - CertaPro of York

Exterior Repainting Project

Ready to make a change?

Schedule an Estimate

Residential Exterior Painting in York, PA

We have recently finished a residential painting project in Dover, PA. The focal point of this endeavor was a four-bedroom home constructed in the late 90s, which our clients acquired as their dream home in 2022. Motivated by a desire for a more modern and bold aesthetic, they entrusted us with transforming the appearance of their new abode.The aluminum siding was originally in a tan color, which was the same as the surrounding houses. All and all the house was in good shape, so the prep work was kept to a minimum.  

About the Project:

Project Involvement: 

We have recently completed a residential painting project in Dover, PA, focusing on a four-bedroom home built in the late 90s. Our clients, who acquired this property as their dream home in 2022, sought a more modern and bold aesthetic for the exterior. The original aluminum siding, initially a tanned, almost beige color similar to surrounding houses, was in good condition overall, requiring minimal preparation. Our two-person crew was tasked with painting all the siding and fascia of the house. The client introduced additional elements to achieve the desired look, such as including window frames, fascia, and porch ceiling to match the house’s fascia. These additions played a crucial role in attaining the final result that met the customer’s expectations.

Special Challenges: 

The homeowner maintained a challenging third-shift schedule, necessitating punctuality and efficient work from our crew while maintaining a low noise level to avoid disturbing their rest hours. Additionally, any requested additional work by the customer had to be swiftly quoted and approved to ensure the project stayed on schedule. This flexibility was crucial in meeting the unique demands of the homeowner’s schedule and accommodating real-time adjustments to the project scope.

Project Timeline:

Overall we finished the project within 4 days.