Our team was contracted by Tuckerton Road in August 2022 to update the building exterior. The project involved power washing, scraping loose peeling paint, caulking, priming bare spots, and applying a fresh coat of paint.

The project involved a unique challenge due to the condition of the building’s exterior. There was a lot of peeling paint and we had to make sure we removed all of it so that the new paint would adhere to the wall correctly. The roof height was also a challenge we overcame by using a 40ft boom lift.

Overall, we completed the project in two days and the Tuckerton Road staff were thrilled with the results.