Apartment Building Painting Project

Commercial Painting Project in Fairfax, Virginia

Ready to make a change?

Schedule an Estimate

Apartment Community Painting Project in Fairfax, Virginia

This is a 12 – 4 story building apartment community containing 460 homes managed by Greystar Management. We power washed the buildings and painted 82 garage doors, all wood trim, railings, columns, balcony ceilings, corner boards, fascia. This project required the use of an 80ft articulated lift and 60 ft ladders. This community had not been painted in the last 10 years. The surfaces that we painted were dingy and gray with spotty mold on all of the surfaces. The garage doors were white and we changed the color to 1 Sherwin Williams Iron Ore, a dark grey. This required a prime and two color coats.

CHALLENGES:

Many of the apartment buildings are 3 stories high and in areas where residents need to get in and out of their driveways / garages. We had to set up an articulating lift to reach some of the surfaces, and position the lift in ways to not interfere with the coming and going of residents in the community.

CONDITIONS:

This community had not been painted in the last 10 years. The surfaces that we painted were dingy and gray with spotty mold on all of the surfaces. Some sections of the exterior had wood rot that required carpentry and wood replacement services to repair

PROJECT INVOLVEMENT:

  • Painting.
  • Power Washing
  • Carpentry repairs
  • Exterior drywall ceiling repairs

PROJECT TIMELINE

Started: September 2020
Duration: 7 Weeks

BEFORE PHOTOS

We surveyed the property before beginning any work.

3 Story Apartment Building

3 Story Apartment Building

The buildings had some hard to reach exterior surfaces that would require special equipment to reach.

Garage Doors Before

Garage Doors Before

Before the project, the garage doors were white, the colors were updated as part of the project.

PROJECT IN PROGRESS

Below are a few photos taken while the team was working on the project. Click on any of the images below to zoom in.

Crew at work

Crew at work

The team utilized ladders of varying sized to paint and repair surfaces on the exterior.

80ft articulated lift

80ft articulated lift

Our team is trained in the use of lift equipment to handle the hardest to reach places.

New Colors for Garage Doors

New Colors for Garage Doors

A CertaPro team member working on the final touches of the new garage door paint job.

THE FINAL RESULTS

The exterior is updated with new colors for the garage doors and repaired sections of wood and trim. The building looks fantastic with results that will last for many years to come.

Like-new exterior

Like-new exterior

The team utilized ladders of varying sized to paint and repair surfaces on the exterior.

After Painting

After Painting

An after photo showing some of the exterior and trim after painting.

Exterior Restored

Exterior Restored

This photo gives a better look at the new garage door colors, they came out looking great.

Apartments After Painting

Apartments After Painting

Taken further back to better show the size and scope of the buildings and how they look after painting and repairs were completed