In early 2019, CertaPro Painters of Rock Hill & SW Charlotte helped Hyster-Yale transform their global showroom from a dated industrial space to a branded destination as part of preparing for a major international event.

The building was in generally good condition and needed only minor repair to EFIS surfaces and other areas.  Some expansion joints needed attention with new backer-rod and sealant.  It was in need a of a good washing before further work could be done.

The CertaPro painters were courteous and efficient. We were very happy with the work they did for us.

- Sheila W.

Sheila W.

Get a Free EstimateBack

CHALLENGES:

In early 2019 we helped Hyster-Yale prep for an international event. We transformed their global showroom from a dated industrial space to a branded destination. Ultimately, the building was in good condition.

We used a 65′ articulated boom lift in order to access the large overhead entrance canopy.  Our team of commercial painters used additional lifts to increase production speed. They used multiple masking efforts in order to articulate the color banding. Full masking of the multi-storied window sets.

CONDITIONS:

  • Good overall condition.
  • Minor EIFS repairs necessary.
  • Power washing was necessary before work could begin.

PROJECT INVOLVEMENT:

  • Branded painting.
  • Repairs to EIFS surfaces.
  • Expansion joint updates with backer-rod and sealant.
  • Power washing prior to complete repainting.

PROJECT TIMELINE

Started: Early 2019
Duration: 4 weeks

BEFORE PHOTOS

Before the project began we did an assessment of the building. A number of issues were found. We included repairs in the full project outline.

Before Entrance

Before Entrance

Before Work

Before Work

New branded colors needed

New branded colors needed

WORK IN PROGRESS

Due to the large size of the building and it’s difficult to reach surfaces, extension ladders and a lift were used to get crew members safely into a position where they could make repairs and paint surfaces.

Cranes and Lifts onsite

Cranes and Lifts onsite

Cranes and Lifts onsite

Cranes and Lifts onsite

THE FINAL RESULTS

After completion we walked around the building and took photos of each area of concern that were noted at the beginning of the project. The once failing surfaces look brand new again.

After Branded Painting

After Branded Painting

After Branded Painting

After Branded Painting

After Branded Painting