7,000 Square Foot University EV Lab Transformation

The commercial renovation project took place in Ypsilanti, MI, in November 2024, and was completed within a month. The project focused on transforming a 7,500-square-foot university electric vehicle (EV) lab, which consisted of two large rooms, into a space suited for a different use.

SCOPE OF THE PROJECT:

At the start of the project, the facility’s surfaces were heavily soiled, requiring thorough cleaning using compressed air. To protect equipment and flooring, all items were covered with plastic before painting began. The work involved painting both block and drywall surfaces, as well as cleaning and painting large duct tubes along the ceiling.

CHALLENGES AND RESOLUTIONS:

The project presented several challenges, particularly due to the height and complexity of the space. The team utilized two lifts, scaffolds, and a compressor to effectively complete the work. Despite these challenges, the project was completed efficiently, leaving the facility with a clean, refreshed appearance suited for its new purpose.

TIMELINE: 1 month

EARLY STAGES

A look into the preparation put in to each work area as our team cleans, preps, and refreshes the interior of this massive facility!

Before the Project

Before the Project

Heavily soiled surfaces and ductwork before cleaning, with dust and debris covering the walls and ceiling.

Converting a Lab Classroom

Converting a Lab Classroom

The lab required cleaning and protection of existing equipment

Ready For An Update

Ready For An Update

A view of the walls and ceiling tubes in need of a refresh.

Work in Progress

Work in Progress

Protective plastic sheeting covers equipment and flooring as painting begins on the block walls.

New Classroom: Coming Soon

New Classroom: Coming Soon

Workers using lifts and scaffolding to clean and paint the high ceiling ductwork and walls.

COMPLETED PROJECT

Check out photos of the updated lab classroom after the project was completed.

Completed Project

Completed Project

A completed section of the facility featuring crisp, newly painted diagonal stripes on the walls.

Updated Classroom

Updated Classroom

Wide shot of the updated lab, now ready for its new purpose.

Clean and Bright

Clean and Bright

Bright, freshly painted walls and ceiling ducts give the space a clean, updated look