Multipurpose Gym of a Church in Plymouth, MI
CertaPro Painters® of Plymouth, MI had the opportunity to work on an interior painting project for a multipurpose gym within a church that was also being used as the main place for worship. The church wanted to improve the sound in the gym and had a special 2.5″ thick sound absorption system applied to the ceiling. We followed by painting the rest of the ceiling all in the same color of gray. Then we painted all the walls and doors and even a fabric dividing wall in grays and light colors. We used 3 lifts for this project and protected the floor, speakers, and other systems. To counteract some challenges we faced with this project, we removed doors to fit the lifts in the gym and helped take down and reinstall protective cages for the lights. As a result, the church was amazed by the new look and sound improvement. It was a delight to work with a community-driven church that supports so many people.
CertaPro Painters® of Plymouth, MI are equipped with the materials necessary to tackle large projects like this, while meticulously taking care of your surroundings. You can rest at ease to know our professionals are seamless, efficient, and precise.
CHALLENGES:
Large commercial projects provide their own set of challenges. CertaPro’s painters of Plymouth were faced with some. Large projects can require big equipment necessary to achieve our goals. This can include large mechanical lifts.
Painting projects like these can sometimes have preexisting barriers like the protective cages for the ceiling lights of this gym.
CONDITIONS:
- Absorption System Repair– A 2.5″ absorption system was required before the painting process could commence
- Ceiling Prep – Had to remove the protective cages before the painting process in order to provide thorough coverage.
PROJECT INVOLVEMENT:
- Prep – Gym room doors were removed to fit our 3 lifts inside the space. We removed the protective cages around the lights, which we helped reinstall after.
- Paint – Repainted the walls, doors, and a fabric dividing wall in grays and light colors.PROJECT TIMELINE – 1 month
BEFORE PHOTOS
Before the project began, an assessment of the building was completed and pictures were taken of the areas that needed attention.
THE FINAL RESULTS
After completion, areas of concern were surveyed and pictures were taken to validate the quality of work.