The Schertz YMCA focuses on youth development, healthy living, and social responsibility, and incorporates core values of caring, honesty, respect, responsibility, and faith. We were contacted by the Schertz YMCA to provide a bid to paint the interior of their facility as part of a large capital improvement remodel. We were asked to provide a bid to repaint the gym, the hallways, the workout studios, and the large exercise room. The facility manager wanted to use new colors for the interior walls that are more in-line with their corporate branding and logo. The colors selected were much bolder than the current color scheme. The current paint job had shown signs of wear.

gym

 

 

Project Involvement:

The project involved painting and some light drywall repairs. After securing the contract to paint, Anthony did a job walk with the facility manager to take note of any final details. The YMCA was only going to be closed for one week, so we decided to put two commercial crews on the job to stay within their timeline. These crews have worked together in the past and we knew they could get the job done.

Challenges:

Throughout the project, our teams coordinated with staff and other contractors (flooring, safety pad installers in the gym, and new exercise equipment installers) to maintain a safe and efficient process to complete within the allotted timeline. The job was completed during daytime hours over 8 days. The total amount of paint was approximately 80 gallons. We completed the job within the allotted time and the gym was able to open back up on schedule.

Special Equipment:

The tall walls in the main exercise room as well as the gymnasium required the use of two scissor lifts.

Before Photos

Below is what the YMCA looked like prior to our painting services. Click on any image to zoom in.

Before Studio

Before Studio

This is what the studio once looked like.

Gym Before

Gym Before

The gym was dated like most of the facility.

Main Space Before

Main Space Before

Our team renovated multiple rooms.

YMCA Before

YMCA Before

We refreshed the main space in the facility as well.

In-progress Photos

Planning the Project

Planning the Project

Making the game plan for the gymnasium.

Gym In-progress

Gym In-progress

Here we are beginning the gym renovation.

New Color Scheme

New Color Scheme

Gym difference between gray wall completed versus the old wall.

Gym Refresh

Gym Refresh

Here we are moving forward with the gym updates.

Main Space During

Main Space During

This is our team painting the main space.

Project Inspection

Project Inspection

Main space inspection with Anthony and Jesse.

Rolling Walls

Rolling Walls

Here is our team rolling the walls.

Final Results

Below is how the YMCA looked after our experienced painters finished the job.

After Studio

After Studio

The studio looks more vibrant and inviting.

Gym After

Gym After

The gym has a more modern look with new colors.

Main Space After Painting

Main Space After Painting

The workout room is ready for the community to enjoy.

Main Space Refresh

Main Space Refresh

The local YMCA looks brand new.