Commercial Project Highlight

Sumner Academy

Ready to make a change?

Schedule an Estimate

In this case study, we recap a commercial painting project undertaken in July 2023 at Sumner Academy, a private school in Gallatin, TN. Below are the highlights of this project:

Describe the condition of the facility/surfaces at the time work began.

Sumner Academy was built in 1973. It had never been painted and was composed of brick and metal substrates. The organization wanted to refresh the school in order to bring in more students.

What did the project involve?

  • Painting
  • Carpentry repair of soffits
  • Reglazing windows

How long did the project take, start to finish?

The project was completed in 28 days.

Were there any special challenges involved?

Metal roof with summer heat.

Did the project require any special equipment or techniques?

Multiple Graco 695 sprayers and scaffolds.

Media Center (Before)

Media Center (Before)

Media Center Alternative View (Before)

Media Center Alternative View (Before)

Field House (Before)

Field House (Before)

Graco 695 Sprayer

Graco 695 Sprayer

Student Center (After)

Student Center (After)

Building Rear (After)

Building Rear (After)

Field House (After)

Field House (After)

Here is a recap video of the project.