Commercial Project Highlight

Red Cedar Glen

Ready to make a change?

Schedule an Estimate

In this case study, we recap a commercial painting project that occurred in December of 2022 for the Red Cedar Glen, an assisted living facility. We detail the experience of this interior painting project and share some before and after photos below.

Describe the condition of the facility/surfaces at the time work began.

The 50,000 square feet facility was founded in 2002 and suffered from outdated drywall and trim which needed to be repaired and repainted. We also needed to remove popcorn ceiling in many areas.

What did the project involve?

  • Painting
  • Drywall repair and full replacement
  • Carpentry repairs to door casings

How long did the project take, start to finish?

The project was completed in 30 days.

Were there any special challenges involved?

  • Major drywall repair in the game room (picture below)
  • Removal of popcorn ceilings

Did the project require any special equipment or techniques?

Tools for knocking down popcorn ceiling.

Hallway Wooden Floor (Before)

Hallway Wooden Floor (Before)

Drywall (Before)

Drywall (Before)

Ceiling Walls (Before)

Ceiling Walls (Before)

Ceiling Damage (Before)

Ceiling Damage (Before)

Ceiling (Before)

Ceiling (Before)

Carpeted Hallway (Before)

Carpeted Hallway (Before)

Hallway Wooden Floors (After)

Hallway Wooden Floors (After)

Hallway Intersection (After)

Hallway Intersection (After)

Drywall Repair (After)

Drywall Repair (After)

Carpeted Hallway (After)

Carpeted Hallway (After)

Here are some videos that were taken during the project.