Commercial Project Highlight
Goodlettsville Pentecostal Church
In this case study, we recap a commercial painting project undertaken in August 2023 at the Goodlettsville Pentecostal Church. Below are the highlights of this project:
Describe the condition of the facility/surfaces at the time work began.
The facility was in the process of being remodeled. Several areas became scoped for a complete replacement of drywall.
What did the project involve?
- Drywall Removal
- Complete Drywall Replacement
- Carpentry
- Spraying dryfall on the metal ceilings
How long did the project take, from start to finish?
The project was completed in 3 weeks.
Were there any special challenges involved?
The height and spacing in conjunction with the seating presented challenges to the higher areas.
Did the project require any special equipment or techniques?
Multi-level scaffolding. Industrial Dryfall from Sherwin Williams was used on the metal ceilings for adhesion.