This building was in need of a repaint to match the company signature branding.

This building exterior was in need of a full repaint. CertaPro Painters of Far North Texas was ready to take on this job.

Exterior Bay

Exterior Bay

The back of the building was the easiest to complete. In addition to painting, we replaced all 110 joints around the building.

Doors

Doors

The front of the building was a large 24/7 loading/unloading operation. Coordination was key to minimize impact and dock downtime.  The project was completed on time – 28 days to complete.