Industrial Painting Project in Muncie, Indiana

Taurus Tool and Engineering in Muncie, Indiana was seeking professional painters to help them refresh their facility and remove yellowish stains on some white areas. This included things like cleaning and getting rid of ceiling and wall stains from years of smoke damage coming from the machine equipment.

The main purpose for them was to have a trusted partner give the facility new life and make sure all dirt or stains were removed from interior surfaces. The project posed some unique challenges, including the need to work in an existing facility that hadn’t been cleaned in a while and needed all surfaces cleaned by hand.

“Zack, Drew and Chris were always there to answer any of my questions and take care of any concerns. Gregorio and his crew were awesome! They did an excellent job on the interior transformation of this shop! We couldn’t be more pleased!”

 

interior painting project

Get a Free Commercial Painting Estimate

Click the button below to request a free estimate from the CertaPro Painters of Indianapolis team.

Get a Free Estimate Back

CHALLENGES:

The main challenge our team faced while completing this project was that the facility hadn’t been cleaned in a long time and there were a lot of stains to remove. To do this, we needed to clean the entire facility by hand to ensure all the dirt, oil, and other debris were removed from all interior surfaces.

Our team also needed to make sure that we were using specific priming products on the surfaces we were painting that previously had stains. This was critical to ensure the newly painted surfaces showed no signs of stains.

CONDITIONS:

  • 40-year-old industrial building that previously served as a welding, tool and die, and manufacturing warehouse
  • Many stains on both the ceiling and the walls in the facility

PROJECT INVOLVEMENT:

  • Plan: Working with Taurus Tool and Engineering to understand their unique needs and how we could best complete the cleaning and painting of their facility.
  • Clean: Providing cleaning treatments with solutions, by hand, to ensure the interior space and its surfaces were ready for the repaint.
  • Paint and Repair: Applying primer and paint and making repairs to the ceiling, drywall, corrugated metal walls, roll-up doors, man doors, door frames, stairs, railings, and dock levelers.

PROJECT TIMELINE

This project took our team around 6 weeks, from start to finish, to complete.

BENEFITS

The attention to detail our team brought, allowed for a successful project that gave the facility a refreshed look. All of the cleaning, repairs, and painting we did, made Taurus Tool and Engineering proud to see their space brought back to life. When we completed the project, they were proud of the outcome.

Before Photos

The photos below were taken before the project started.

Fading Interior Walls

Fading Interior Walls

The colors on the interior walls were starting to show signs of age, the prep process will clean the surfaces and paint them to a like-new condition.

Darkened Ceiling

Darkened Ceiling

This photo gives a look at the condition of the ceiling prior to painting, the ceiling also had darkened tiles in need of attention.

Piping & Equipment

Piping & Equipment

The industrial facility had piping that will be cleaned and painted as part of the project.

In Progress

The below photos were taken during the project and show the crew at work.

Ceiling in Progress

Ceiling in Progress

This photo was taken mid-way through painting the ceiling, the room has a much brighter look even at this point in the project.

Lift Equipment Used

Lift Equipment Used

Lifts and ladders were used to reach the ceiling and higher portions of the walls during the project.

Interior Walls & Support Beams

Interior Walls & Support Beams

The interior walls were nearly completed at the time of this photo being taken, the support columns were also updated.

After Photos

The below photos show the transformation of the interior of the building after the project was completed.

Updated Bay Doors

Updated Bay Doors

The bay doors were painted with a high durability paint that will last for many years to come.

Interior Walls & Equipment After

Interior Walls & Equipment After

The space has a much brighter and more modern look.

Office Area After

Office Area After

This enclosed workstation was also painted as part of the project.

Workstation After

Workstation After

After photo of another work station, the space looks cleaner and has a layer of protection to protect the building materials.

Ceilings After

Ceilings After

This photo gives a view of most of the ceiling after the project was completed.

After Painting

After Painting

A wide angle photo of the completed space after the painting was done.

Project Before & After Photos