Exterior Tilt Up Project in Greenfield – Midwest Mole

The building is a large tilt-up precast building that houses both the office and warehouse operations for Midwest Mole. The building is in Greenfield, IN located in a large open area.

The building had the original, builder grade coating that was around 5 years old. The coating had faded badly, and the customer was looking to find a coating solution that would hold up to the extreme conditions that the building would naturally be affected by being out in an open area with few other buildings around. Because of this, we discussed the benefit of using Premium products from Sherwin Williams such as Emerald and Pro-Industrial Sher-Cryl.

The crew did an excellent job painting the exterior of our house. The attention to detail was impressive. They also repaired our back deck and repainted it as well. The crew verified our paint choice before starting, ensuring our satisfaction. When we didn’t like the trim color, the supervisor reached out to us for a different color choice. They had no problem changing the color.

- Philip B. | Indy Resident

Philip B. | Indy Resident

Get a Free EstimateBack

Before and After

CHALLENGES:

The building is a large tilt-up precast building that houses both the office and warehouse operations for Midwest Mole.

The building had the original, builder grade coating that was around 5 years old. The coating had faded badly, and the customer was looking to find a coating solution that would hold up to the extreme conditions that the building would naturally be affected by being out in an open area with few other buildings around. Because of this, we discussed the benefit of using Premium products from Sherwin Williams such as Emerald and Pro-Industrial Sher-Cryl.

CONDITIONS:

  • Builder grade exterior was badly deteriorated.
  • Extreme weather conditions.

PROJECT INVOLVEMENT:

  • Pressure Washing
  • Painting
  • Concrete Repairs

PROJECT TIMELINE

Started: June 2018
Duration: 4 weeks

BEFORE PHOTOS

Before the project began we did an assessment of the building. A number of issues were found.

Before

Before

THE FINAL RESULTS

After completion we walked around the building and took photos of each area of concern that were noted at the beginning of the project. The once failing surfaces look brand new again.