James H Drew Industrial

Featured Commercial Project

Ready to make a change?

Schedule an Estimate

See All Commercial Painting Services

Industrial Painting Project in Indianapolis
James H Drew Property

The James H Drew property contains multiple office and warehouse buildings. For this project, CertaPro painted the exterior of 3 corrugated metal siding warehouse buildings. James H Drew’s warehouse buildings store equipment and materials for daily operations, both inside and around the exteriors. James H Drew is located on the Northwest side of Indianapolis, IN.

The buildings were previously painted and had shown signs of peeling paint as well damage to the various areas of siding. As with many corrugated metal warehouses, siding dent repairs were not a large concern of the client, however, making sure the building was properly cleaned and all peeling paint was appropriately prepped and sealed prior to painting was the focus. The work was completed during normal working hours which meant tight communication by CertaPro’s Production Team with the management of James H Drew was required so that the employees and painters did not interrupt either groups work.

Ethan was very personable & knowledgeable. I didn’t feel pressured and I appreciate that.

- Jen H.

Jen H.

Get a Free EstimateBack

CHALLENGES:

James H Drew’s warehouse buildings store equipment and materials for daily operations, both inside and around the exteriors. This means teams for work needed to access the area daily.

The buildings were previously painted and had shown signs of peeling paint as well damage to the various areas of siding. As with many corrugated metal warehouses, siding dent repairs were not a large concern of the client, however, making sure the building was properly cleaned and all peeling paint was appropriately prepped and sealed prior to painting was the focus. The work was completed during normal working hours which meant tight communication by CertaPro’s Production Team with the management of James H Drew was required so that the employees and painters did not interrupt either groups work.

CONDITIONS:

  • Dented, peeling warehouses
  • Busy areas surrounding work

PROJECT INVOLVEMENT:

  • Pressure Washing
  • Scraping Peeling Paint
  • Spot Priming w/ Metal Primer
  • Painting

PROJECT TIMELINE

Started: July 2019
Duration: 2 weeks

BEFORE PHOTOS

Before the project began we did an assessment of the building. A number of issues were found including peeling paint, busy work areas and damaged walls.

Before

Before

Before

Before

Before

Before

THE FINAL RESULTS

After completion we walked around the building and took photos of each area of concern that were noted at the beginning of the project. The once failing surfaces look brand new again.

After

After

After

After

After

After

After

After

After

After