Multi-Unit Condo Painting Project in Indianapolis

CertaPro received the opportunity to repaint all buildings in the Canterbury Condominiums community in November of 2018 from Kirkpatrick Management Company and Jerry Barth who is the Property Manager for the community. The project consisted of 15, two story condo buildings,1 clubhouse, and 1 guard shack. Multi-unit projects like this one often require detailed planning and communication plans, The CertaPro Painters of Indianapolis team has the experience and were up for the challenge.

CHALLENGES:

Mutli-unit projects like these require careful coordination with property managers and residents, a communication plan was used to streamline this process. Additionally some condos had issues like rotting wood, peeling paint or other imperfections that needed to be addressed.

Additionally many of the buildings had considerable height. Painting these buildings required appropriate safety precautions be taken by crew and management.

This project started in April of 2019 and ended in May.

CONDITIONS:

  • Peeling paint – washing, scraping, and spot priming of bare areas of wood.
  • Failing caulking – CertaPro addressed all caulking needs where gaps existed in-between two wood substrates.
  • Rotten wood – replaced all rotten wood that was noted prior to the start of the project and after additional repairs were discovered and approved by the client.
  • Positive lead paint tests – All work was done in accordance to EPA Lead Preparations.

PROJECT INVOLVEMENT:

  • Prep – Clean and prep all surfaces for paint, fix issues with caulking, rotted wood, and peeling paint
  • Paint – Exteriors of all 15 two story condo buildings, the clubhouse and the guard shack.

PROJECT TIMELINE

Begining of April 2019 – End of May 2019 (Approximately 2 months)

BEFORE PHOTOS

Before the project started, we did a tour of the 15 condo buildings as well as the clubhouse and guardshack to survey the condition of the paint and exterior surfaces.

Failing Trim

Failing Trim

There were many windows with peeling paint on the trim and wood rot around the perimeter.

Mold / Fading Paint

Mold / Fading Paint

There were signs of mold growth and fading colors from sun and age on porches and balconies.

Soffit Damage

Soffit Damage

Several soffits had rotting wood that would need repair prior to painting.

Wood Rot & Peeling Paint

Wood Rot & Peeling Paint

Bases of decorative columns and doorways were showing signs of peeling paint and wood rot.

Failing Paint

Failing Paint

Some exterior surfaces had paint that was peeling or bubbling from age.

THE FINAL RESULTS

After completion we walked around the building and took photos of each area of concern that were noted at the beginning of the project.

Guard Shack

Guard Shack

Completed shot of the guard shack, exterior surfaces, doors, and trim were painted.

Condo Exterior

Condo Exterior

Front entry of one of the 15 condo buildings after the project was completed.

Entryways

Entryways

One of several entry's around the complex after painting and repairs were made.

Exterior with Entryway

Exterior with Entryway

This picture shows a unit with front entry and the window trim that was painted

Clubhouse

Clubhouse

The clubhouse was also painted and had minor repairs and touch up work done