An automotive facility in Indianapolis, Indiana was seeking professional painters to help them clean and repaint the interior of one of their plants. This included things like plant walls, railings and other surfaces. The main purpose for them was to have a trusted partner clean and paint interior spaces inside a factory that required the use of industrial products. The project posed some unique challenges, including the need to work inside a factory and around all of the equipment and piping.

Interested in updating the interior of your commercial buildings? Contact us to set up a free estimate appointment.

Get a Free Commercial Painting Estimate

Click the button below to request a free estimate from the CertaPro Painters of Indianapolis team.

Get a Free Estimate Back

CHALLENGES:

The main challenge our team faced while completing this project was doing interior painting inside a factory and working around the existing space, to find adaptable ways to paint harder-to-reach spaces. Specifically, some spaces were harder to reach than others because of equipment items, piping and other permanent features within the factory.

Making sure our team was always aware of our surroundings was also critical because the factory was never shut down during our working hours. So, we needed to be especially careful to ensure our operations didn’t disrupt the daily duties of employees.

CONDITIONS:

  • Many detailed safety precautions to follow throughout the project’s duration
  • Attention to detail regarding project management to ensure the project ran smoothly and employees weren’t disrupted

PROJECT INVOLVEMENT:

  • Plan: Working with the automotive facility to understand their unique needs and how we could best complete the cleaning and painting without disrupting factory operations.
  • Repair:Making repairs to some drywall areas throughout the factory.
  • Clean:Providing cleaning treatments to ensure the interior space and its surfaces were ready for the repaint.
  • Paint: Using industrial line products from PPG, such as Pitt-Glaze Waterbased Pre-Catalyzed Epoxy and direct to metal products. Our team applied these to surfaces like block and metal walls, metal doors and frames, and steel railings.

PROJECT TIMELINE

This project took our team around 6 weeks, from start to finish, to complete.

 

BENEFITS

The attention to detail our team brought, allowed for a successful project with zero safety concerns and minimal disruptions to employees. Additionally, the fresh paint really brought all the surfaces within the factory back to life. When we completed the project, the factory looked refreshed and new.