Challenges

CONDITIONS

We painted the community swimming pools, which had been drained before the project. The cement pools were dirty, and the surfaces were mostly bare concrete – with not much of the previous coating left.

PROJECT INVOLVEMENT

    • Preparation – We power washed the pools, cleaned all surfaces with an acid cleaner (Ramuc Clean & Prep Solution applied with brushes), and thoroughly rinsed off the cleaner with a power washer. After the surfaces had dried, we applied two coats of Ramuc Specialty Pool Coatings DS Water-Based Acrylic, color Dawn Blue. The coating was applied with rollers and brushes.
    • Painting – We had to assure that all the acid cleaner was rinsed completely and before it had a chance to dry prior to painting. During the entire project, we had to run hydraulic pumps to avoid seepage of groundwater.

PROJECT TIMELINE – May 2022 – The project was completed in four days by a team of three painters.

BEFORE PHOTOS

Before the project began, CertaPro Painters® of Freehold-Hightstown, NJ  team took pictures of the pool and its current look before we got to preparation.

Pool Before

Pool Before

Pool Before

Pool Before

Pool During

Pool During

Pool During

Pool During

Pool During

Pool During

THE FINAL RESULT

After the pool was complete, CertaPro Painters® of Freehold-Hightstown, NJ gathered images of the finished product.

Pool After

Pool After

Pool After

Pool After

Pool After

Pool After