In August 2025, CertaPro Painters® of Fort Collins completed a mixed-use property exterior painting project in Fort Collins, CO.

The team refreshed masonry, metal doors, bollards, utility boxes and conduits, while also replacing missing downspouts to prevent water damage.

Using specialized primers and Sherwin-Williams SuperPaint, the property received a durable, graffiti-resistant finish.

The result was a clean, professional appearance with long-lasting protection in a high-traffic corridor near CSU and Old Town.

painter on ladder against commercial building wall

SCOPE OF THE PROJECT:

The work included repainting masonry, metal doors, and utilities, as well as replacing missing downspouts to prevent future water damage.

Before work began, the rear-facing exterior showed significant wear. Paint was peeling from brick and masonry surfaces, while galvanized steel doors showed signs of rust and bare metal exposure.

Utilities, bollards, and trim were weathered and in need of repainting, and missing downspout sections posed potential drainage issues. Left untreated, these conditions could have caused long-term structural and aesthetic problems for the property.

SPECIAL TECHNIQUES:

The project involved a thorough preparation and finishing process. Crews used commercial power washing to remove dirt, mildew, and failing paint, followed by hand scraping to ensure a sound surface.

Specialized primers were applied, including XIM bonding primer for galvanized steel doors and Loxon Masonry Primer for bare brick and concrete. For the finish, Sherwin-Williams SuperPaint in Low Luster sheen was used to provide a durable, graffiti-resistant coating. Doors, frames, bollards, and utilities were repainted to match the property’s existing color scheme, while two missing downspout sections were replaced as part of preventative maintenance.

To complete the work effectively, the crew relied on commercial-grade power washing equipment, professional primers and coatings from Sherwin-Williams, and a combination of brush, roll, and spray techniques. Daily cleanup and masking protocols were followed to protect landscaping and non-painted areas.

PROJECT TIMELINE:

One week

Before Photos

Below are photos of the area before the project began. Click on any image to zoom in.

Rusted Utility Boxes & Conduits

Rusted Utility Boxes & Conduits

Rusted Utility Boxes & Conduits

Rusted Utility Boxes & Conduits

Rusted Utility Boxes & Conduits

Rusted Utility Boxes & Conduits

Peeling Exterior Paint

Peeling Exterior Paint

Peeling Exterior Paint

Peeling Exterior Paint

Peeling Exterior Paint

Peeling Exterior Paint

Signs of Wear

Signs of Wear

Signs of Wear

Signs of Wear

Signs of Wear

Signs of Wear

Paint Damage

Paint Damage

Paint Damage

Paint Damage

Progress Photos

These photos show the work as it developed. Click any image to zoom in.

Spot Priming

Spot Priming

Spot Priming

Spot Priming

Spot Priming

Spot Priming

Repairs in Progress

Repairs in Progress

Repairs in Progress

Repairs in Progress

Repairs in Progress

Repairs in Progress

After Photos

View photos of the final results here!

Refreshed Exterior Walls

Refreshed Exterior Walls

Refreshed Exterior Walls

Refreshed Exterior Walls

Refreshed Exterior Walls

Refreshed Exterior Walls

Repainted Doors & Utilities

Repainted Doors & Utilities

Repainted Doors & Utilities

Repainted Doors & Utilities

Repainted Doors & Utilities

Repainted Doors & Utilities