CONDITIONS

The ceiling was an open web metal. The walls are precast concrete. All bollards and support post painted .

PROJECT INVOLVEMENT

    • Preparation – Painting, and cleaning of surfaces drywall repair in offices. The project had to be completed within two months from the start time. So we had to make sure our team was able to get the project prepped in time, and give us enough time to paint it as well.
    • Painting – Our team of professionals had to use a compressor to blow down dust and spray over 7,000 gallons of paint on the ceiling.

      PROJECT TIMELINE
      – December 2021

BEFORE PHOTOS

Before the project began, CertaPro Painters® of Des Plaines/Chicago Northwest, IL team took pictures of the conditions of the interior of the building was in. A lot of dust needed to be removed before our team could start painting the ceiling.

Industrial Warehouse Interior Before

Industrial Warehouse Interior Before

Industrial Warehouse Interior Before

Industrial Warehouse Interior Before

Industrial Warehouse Interior Before

Industrial Warehouse Interior Before

THE FINAL RESULT

After the project was complete, CertaPro Painters® of Des Plaines/Chicago Northwest, IL gathered images of the new finish of the building.

Industrial Warehouse Interior After

Industrial Warehouse Interior After

Industrial Warehouse Interior After

Industrial Warehouse Interior After

Industrial Warehouse Interior After

Industrial Warehouse Interior After

Industrial Warehouse Interior After

Industrial Warehouse Interior After

Industrial Warehouse Interior After

Industrial Warehouse Interior After