Lakeside At the Sanctuary Exterior Renovation

Featured Commercial Project

Ready to make a change?

Schedule an Estimate

Townhome Complex Painting Project in Worthington, OH

In September of 2018 we completed a painting project for a large townhome complex consisting of 34 building Off of State Route 23 in Worthington. Many of the front wood railing systems, posts, and rear fences had sever wood rot problems. Additionally many of the door frames had decorative trim that needed replacement, and the colors of the paint on the exterior of the buildings was faded to time and weather.

The project included painting and carpentry work for all 34 buildings. Work included painting or repair of siding, soffits, fascia, wood window trim, porch and balcony ceilings, balcony rails, doors, door frames, shutters, fences, and gates. We also did similar work on many of the shared buildings and structures including  the maintenance building, mailboxes, gazebos, carports, and the dumpster surrounds.

 

hoa painted in columbus oh

BEFORE PHOTOS

Prior to the project starting our estimator walked the property and took some photos of the condition of the buildings and shared structures.

Crew at work

Crew at work

This photo shows CertaPro crew members getting started on painting of the shutters on one of the buildings

Shared buildings

Shared buildings

The project included painting and repairs for shared buildings in the community. The trim around the windows was starting to wear and had failing paint.

Community Structures

Community Structures

The project also included various shared structures on the property like this bridge. The wood had rot and peeling paint.

Fences & Trim

Fences & Trim

Many of the back yards on the townhomes have a fenced in area, most of the fences needed some repairs and painting done.

Pool House Before Painting

Pool House Before Painting

This picture shows the pool house and pool area prior to the project starting. Painting the water facing side of this building would require special equipment.

THE FINAL RESULT

 

Pool House After

Pool House After

The projected included most buildings and structures on the property including this pool house.

Back of Townhomes After Painting

Back of Townhomes After Painting

In addition to restoring the fences and siding on the dividers, the trim and siding on the homes was updated.

Townhomes After Painting

Townhomes After Painting

Exterior painting to all the siding and wood surfaces. Removal and installation to all the front wood railing systems, posts, and rear fences with new pvc covers, vinyl siding and Weatherable System.

Back of townhomes after painting

Back of townhomes after painting

The fences in the back yards were updated by remodeling the caps and facsia boards on Townhouse Patio divider fences. We winstalled new vertical vinyl siding on both sides of Patio Dividers

Restored Soffits and Trim

Restored Soffits and Trim

We replaced any areas with rotten wood or damaged trip and painted.

Updated Patio Fence & Railings

Updated Patio Fence & Railings

These guard rails / fences were faded and worn prior to the repairs being made. They were painted white and look brand new again.