The problem to be solved:

The building had been neglected for years and the surfaces to be painted were badly rusted.

Problem solver solution:

The rusted surfaces had to be sandblasted before primer and paint could be applied. Preparing the surfaces to be primed proved to be a special challenge. We used a 40′ boom lift and rust-inhibitive primers.

Final result:

Photos can be seen below of how this building looked before the team began working, as well as how it looked after 2.5 weeks of work.

Before - Under Walkway

Before - Under Walkway

The underside of the walkway before we started working

Building 3000 - Before

Building 3000 - Before

How the rest of the building looked before our work

Building 3000 - After

Building 3000 - After

How the building looked after 2 and 1/2 weeks of work from CertaPro Painters of Chapel Hill

Building 3000 - After

Building 3000 - After

Another angle of the building 3000