The problem to be solved:

In April 2020, we executed a project Westover United Methodist Church in need of interior painting and ceiling repairs. Several
Rooms had lots of wall and ceiling cracks.

Problem solver solution:

The wall painting involved some repairs due to plaster cracks and general wear and tear before any painting started. The Sanctuary ceiling needed some repairs due to previous water intrusion and chips that had flaked off. The high ceiling (30-35 feet) required special lifts and jacks in order to complete the job.

Final result:

We had to execute the project in a timely manner which we were able to do, it took us 10 continuous days except for Sunday to complete.