The problem to be solved:
In addition to painting, the theatre needed many repairs, including drywall and spackling. There was also a lot of machinery and furniture throughout the space. Since they have a full schedule of events, we needed to come up with a plan that wouldn’t disturb their performances and patrons.
Problem solver solution:
In less than a week, our team painted, patched, spackled, and repaired drywall for Act II. Because of the obstacles around the theatre, we sent out a crew experienced in repairing and known for their exceptional attention to detail. We also worked after hours to ensure there was minimal disruption to their daily operations and events.
Final result:
The Act II team said our crew was conscientious and meticulous. Our painters listened to what colors were supposed to go where and got the job done quickly and precisely. They helped move the furniture back and forth and kept everything clean while painting. The final result is a beautiful, updated look!