Case Study: Lawton Construction – Site One Transformation

Commercial Painting Case Study

Ready to make a change?

Schedule an Estimate

Project Overview

Lawton Construction undertook the redevelopment of a former tire distribution warehouse into a functional and visually appealing landscape supply facility. The goal was to transform the industrial space into a multi-purpose environment that included offices, storage bays, a showroom, and collaborative meeting areas.

Our team was contracted to deliver comprehensive drywall and painting services across multiple units, helping bring the client’s vision to life while maintaining durability suitable for a high-traffic commercial setting.

Scope of Work

Unit A – Front-Facing Spaces & Warehouse

  • Painted the lobby, offices, and bathrooms, creating a clean and professional first impression for customers and staff
  • Applied paint throughout the warehouse area up to approximately 12 feet, reaching the mezzanine level to ensure a cohesive industrial finish
  • Applied dryfall to the ceilings in the showroom, improving both aesthetics and lighting reflectivity
  • Completed full painting of the showroom, enhancing product presentation and customer experience

Unit F – Office & Conference Areas

  • Painted newly drywalled office spaces, ensuring a polished and move-in-ready environment
  • Finished the mezzanine conference room, creating a refined space for meetings and collaboration

Challenges & Solutions

  • Industrial-to-commercial conversion: The existing warehouse required finishes that balanced durability with a professional appearance
    • Solution: Used high-quality coatings suitable for both heavy-use areas and customer-facing spaces
  • Mixed-use environment: Coordinating finishes across offices, warehouse, and showroom spaces required careful planning
    • Solution: Maintained consistency in color schemes and finish levels while adapting to each space’s function
  • Elevated work areas: Painting up to mezzanine height required safe and efficient access
    • Solution: Utilized proper lift equipment and staging to ensure precision and safety

Results

  • Successfully transformed a dated warehouse into a modern, functional commercial facility
  • Delivered a clean, cohesive aesthetic across both customer-facing and operational areas
  • Enhanced the showroom environment, improving product visibility and overall customer experience
  • Provided durable finishes designed to withstand daily commercial and industrial use

Conclusion

This project highlights the ability to adapt industrial spaces into professional, multi-use environments through strategic drywall and painting solutions. By combining functionality with visual appeal, the Site One facility is now well-equipped to support both operations and customer engagement.

Before: Worn Surfaces & Pre-Construction Conditions

During: Active Prep, Repairs & Project Execution

After: Clean, Modern Finish & Fully Transformed Space