The Church at Litchfield Park built in 1938 and located at 300 East Wigwam Boulevard. The original church building was actually built out of adobe and has been a beacon of the Litchfield Park area since it was first built. Over the years, it has been added onto with various additions. As time took its toll on the building, it was ready for Certapro’s commercial painters to give it a full facelift.

 

scottsdale commercial painters

Window Trim Repair & Painting

Window Trim Repair & Painting

Scottsdale, AZ

Exterior Repairs & Painting

Exterior Repairs & Painting

Scottsdale, AZ

Commercial Painting Process

CertaPro started with an aggressive pressure wash to remove paint, dirt, and debris. CertaPro scraped all the areas of loose and peeling paint. CertaPro applied full new stucco to the entire front and side facades of the building where the majority of the damage was present. All of these new stucco areas were fully primed to seal the new stucco. CertaPro applied the Sherwin Williams product in a full two coat process.

painting process painting in progress photos

Setting up Scaffolding

Setting up Scaffolding

The CertaPro team setting up scaffolding to help with repairs and painting of the stucco church exterior.

Painting & Repairs

Painting & Repairs

The crew worked to fix any issues with the exterior prior to painting the surfaces.

Conditions:

There were concerns with the amount of peeling paint, damaged adobe and stucco.

Challenges:

The entire campus then underwent a new color change to make it match its neighboring property The Wigwam Resort which was originally built around the same time.

Project Involvement:

CertaPro started with an aggressive pressure wash to remove paint, dirt, and debris. CertaPro scraped all the areas of loose and peeling paint. CertaPro applied full new stucco to the entire front and side facades of the building where the majority of the damage was present. All of these new stucco areas where fully primed to seal the new stucco. CertaPro applied the Sherwin Williams product in a full two coat process.

Special Challenges:

The Church at Litchfield Park Project required CertaPro to utilize an Articulating Boom Lift.

Time Completion: 1 Month

 