Dairy Flooring Case Study

a Case Study by CertaPro Painters® of Schaumburg, IL

Ready to make a change?

Schedule an Estimate

Durable Urethane Coating for Cow Carousel Platforms at Gill Dairy

At CertaPro Painters of Schaumburg, we pride ourselves on delivering durable, high-quality solutions that meet our clients’ unique challenges. In 2024, we partnered with Gill Dairy in South Solon, OH, to enhance the structural integrity and longevity of their cow carousel platforms. Our comprehensive approach involved meticulous concrete repairs followed by the application of a resilient urethane cement coating, ensuring a finish that stands up to the demands of daily farm operations.

Gill Dairy Case Study floor being smoothed behind equipment

About the Project:

  • Client: Gill Dairy
  • Location: South Solon, OH
  • Year: 2024
  • Project Scope: Repairing concrete and applying a urethane cement coating on 72 cow carousel platforms

Project Overview: Our team began by mechanically removing the previous patching material from the deteriorated concrete surfaces. After acid etching and thorough rinsing, we applied Dur-A-Flex UM Primer to all spalled areas and filled voids using Dur-A-Flex UM Mortar. Once the preparation was complete, we installed Dur-A-Flex Polycrete SL Urethane Cement (accelerated) while embedding pre-cut 10-ounce fiberglass woven mesh into the wet material, ensuring complete encapsulation. The surface was then broadcasted with silica and covered with plastic to protect it from cow interference. Finally, we applied a quarter inch of Polycrete MDB and broadcasted it with 100 grit white aluminum oxide to serve as the top coat.

Unique Aspects: To avoid disrupting farm production, the project was executed over four non-consecutive weeks, allowing us to complete 18 platforms per week while maintaining operational continuity.

Unique Challenges:

  • Cows: Working around the cows, which were not accustomed to the increased activity around the carousel platforms, required careful planning and execution.
  • Timeline: The nonconsecutive scheduling demanded strategic planning to eliminate production losses, ensuring the project was completed on time and within budget.

Outcome: CertaPro Painters successfully repaired and coated all 72 cow carousel platforms, delivering a robust, long-lasting finish that met the client’s stringent requirements. The project was completed on schedule and on budget, resulting in a highly satisfied customer—and a few indignant cows along the way.

Before Images

Below are images of the project before we started. Click to enlarge.

Gill Dairy Case Study Before Photo

Gill Dairy Case Study Before Photo

Gill Dairy Case Study Before Photo

Gill Dairy Case Study Before Photo

Gill Dairy Case Study Before Photo

Gill Dairy Case Study Before Photo

Gill Dairy Case Study Before Photo

Gill Dairy Case Study Before Photo

Gill Dairy Case Study Before Photo

Gill Dairy Case Study Before Photo

Gill Dairy Case Study Before Photo

Gill Dairy Case Study Before Photo

Gill Dairy Case Study Before Photo

Gill Dairy Case Study Before Photo

Production Images

Below are images of the project after during production. Click to enlarge.

Gill Dairy Case Study During Photo

Gill Dairy Case Study During Photo

Gill Dairy Case Study During Photo

Gill Dairy Case Study During Photo

Gill Dairy Case Study During Photo

Gill Dairy Case Study During Photo

Gill Dairy Case Study During Photo

Gill Dairy Case Study During Photo

Gill Dairy Case Study During Photo

Gill Dairy Case Study During Photo

Gill Dairy Case Study During Photo

Gill Dairy Case Study During Photo

Gill Dairy Case Study During Photo

Gill Dairy Case Study During Photo

Gill Dairy Case Study During Photo

Gill Dairy Case Study During Photo

Gill Dairy Case Study During Photo

Gill Dairy Case Study During Photo

After Images

Below are images of the project after we finished. Click to enlarge.

Gill Dairy Case Study After Photo

Gill Dairy Case Study After Photo

Gill Dairy Case Study After Photo

Gill Dairy Case Study After Photo

Gill Dairy Case Study After Photo

Gill Dairy Case Study After Photo

Gill Dairy Case Study After Photo

Gill Dairy Case Study After Photo

CertaPro Painters exceeded our expectations by delivering precise repair and durable coating work on our cow carousel platforms. The project was completed on time and within budget, leaving us extremely satisfied.

- Gill Dairy Supervisor

Gill Dairy Supervisor

Get a Free EstimateBack

Other Commercial Services We Provide