11,500 sq foot office and warehouse complex in Rochester Hills, MI

In August of 2020 we completed a commercial painting project for an 11,500 square foot office and warehouse building located in Rochester Hills, MI. The interior of the building had many areas with failing and peeling paint and needed to be prepped and re-painted. The prior paint job was failing due to paint being put over cutting oil, many areas were problematic and needed to be cleaned and repainted. Osco is an industrial products manufacturer with its corporate headquarters in Rochester Hills. The company specializes in the design and manufacturing of valves, nozzles and filters for industrial clients.  Located in Rochester Hills, Osco was preparing to lease one of its facilities.

CHALLENGES:

The facility had been used for manufacturing plastic injection manifolds and other components. The walls had 30 years of cutting oil and saw dust through out the warehouse. Peeling paint was extensive throughout the ware house. The warehouse had been used for lite industrial manufacturing for almost 35 years.  Machine cutting oil and saw dust clung to the warehouse walls. Paint from the previous painter was failing as they painted over the machine all.  Approximately 40 – 60% of the walls  were covered with peeling paint.  You could feel the Oil when you inspected the walls.

Our task was to prepare the walls in an environmentally safe and cost effective manner.  In scope included offices, bathroom, and warehouse walls, ceilings, and doors.

To prepare the walls and remove the large amount of peeling paint we used an Ice Blasting approach that delivered EPA safe results with zero residue. Ice Blasting provide a rapid, safe, environmentally friendly solution to remove the oils and peeling paints through out the warehouse

CONDITIONS:

  • Peeling and failing paint on manufacturing floor , walls and ceilings
  • Bay doors with failing paint
  • Interior offices also needed a new coat of paint.

PROJECT INVOLVEMENT:

  • Office Spaces – Warehouse office space was included as part of the project
  • Production floor & mezzanine 
  • Walls and ceilings

PROJECT TIMELINE

Started: August 2020
Duration: 1 Week

BEFORE PHOTOS

Before the project began an assessment was made of the exterior to account for any special equipment needed.

Failing Paint on Bay Doors

Failing Paint on Bay Doors

During our initial inspection, peeling paint was widespread.

Interior warehouse wall

Interior warehouse wall

Most of the walls had sections of peeling or failing paint.

Discoloration and peeling

Discoloration and peeling

The facility was due for a painting project.

Before Painting - Wide angle

Before Painting - Wide angle

Here is a wider angle view of the space that needed to be painted.

In Progress

Scissor Lifts

Scissor Lifts

We used Scissor lift and twin ice blasting pumps to deliver this project.

Spray Equipment

Spray Equipment

Our crew used sprayers for sections of the interior where the office faces the warehouse floor.

Crew at work

Crew at work

We had painters working multiple sections of the factory at a time.

Floor and equipment cover

Floor and equipment cover

We used tarps and plastic covers to protect floors and equipment from spray and dripping paint.

THE FINAL RESULT

The final result came out great, the space feels much brighter and modern after the project was completed.

After Painting

After Painting

The main warehouse floor after tarps were removed and painting was completed.

After Painting - Wide Angle

After Painting - Wide Angle

A wide angle shot of the warehouse floor upon project compeltion.