Commercial Case Study - CertaPro of Reading

Central Bucks School District Gymnasium

Ready to make a change?

Schedule an Estimate

Commercial Case Study: Gymnasium Ceiling Repainting at Central Bucks School District

CertaPro Painters of Reading was tasked with addressing significant peeling on the ceiling of the gymnasium at Central Bucks School District. The ceiling required thorough scraping to remove the peeling paint, as well as priming of bare spots and repainting of both the ceiling and walls to restore the gymnasium’s appearance and provide long-lasting protection.

About the Project:

Project Involvement: 

CertaPro Painters of Lancaster was tasked with addressing significant peeling on the ceiling of the gymnasium at Central Bucks School District. The ceiling required thorough scraping to remove the peeling paint, as well as priming of bare spots and repainting of both the ceiling and walls to restore the gymnasium’s appearance and provide long-lasting protection.

Special Challenges: 

The primary challenge was dealing with extensive peeling on the gymnasium ceiling, which required careful scraping to avoid damage to the surface beneath. Additionally, the project needed to be completed with minimal disruption to school activities.

Project Timeline:

Overall we finished the project within 1 week.

Before

20241015_191335000_iOS

20241015_191335000_iOS

After