Interior & Exterior Restoration of Department Store

Featured Commercial Project

Ready to make a change?

Schedule an Estimate

Featured Commercial Painting Projects > Retail Painting Project

THE MARKETPLACE IN STURGEON BAY, WI

In September and November of 2020 our team worked with Bayland Builders (General Contractor) on the renovation of an old Younkers department store. The renovated space will become a revitalized retail space in Sturgeon Bay. For the project were were contracted to paint the exterior as well as all of the interior. The project was on a tight production timeline and ran for about two months. With multiple contractors handling various parts of the renovation, careful coordination with other contractors was important.

The exterior of the building had high walls and required a 40ft all-terrain articulating lift to reach and paint all of the surfaces. The exterior brick, fascia, doors and door frames were all painted as part of the project.

Pictured to the right is a photo after the project completion and the store opened. The Marketplace is a home accessories store with a modern and bright interior, they opened for business on November 21, 2020.

 

 

interior after renovation of retail space

BEFORE PHOTOS

Before we started with painting, our commercial project estimator visited the property to take some measurements and take some pictures of the condition of the surfaces that needed painting.

Front of Building Before Painting

Front of Building Before Painting

The old Younkers department store was neglected with failing paint on most of the exterior brick.

Interior Before Painting

Interior Before Painting

The interior space needed a lot of work to get ready for opening day. The walls, ceilings, and support columns would all be painted.

Back of building before painting

Back of building before painting

The painted brick had failing paint around all sides of the building

IN PROGRESS PHOTOS

The below photos were taken in middle of the renovation project. Things started coming together in late October / early November of 2020.

Wide Angle of Interior

Wide Angle of Interior

This shows the scope of the interior, including a basement level down the flight of stairs.

Basement in progress

Basement in progress

The basement level added a lot of extra floor space for the store and was part of the renovation.

THE FINAL RESULT

When the project was completed, CertaPro’s professionals surveyed the area and took images of the newly painted frames on the exterior of St. Mary’s.

Storefront After Painting

Storefront After Painting

The new storefront looks modern and revitalized from the street.

Interior After Painting

Interior After Painting

The store after opening. The space looks brand new and is a bright and attractive environment to shop in.