School Gymnasium Painting Project

In November of 2020 our team completed this gym painting project for the Hillcrest Gymnasium in Pulaski, WI. The Gym was showing its age and was in need of updates. It had been nearly 10 years since the room was last painted. Each school within the district was originally a different color scheme. The School district decided to keep continuity throughout the district with a matching color palate across schools.

The project inolved dryfall ceilings, HVAC ductwork, and caulking for cracks in the ceiling. A floating door was created to protect the gym floor, lifts and scaffolding were able to drive on it without damaging the floor. We used a 25ft. Electric lift, ladders, and scaffolding to reach the ceiling areas.

gym painting project

VIDEO OF FINAL RESULT

See this short video to see details of the gym after the project was completed.

Before Photos


The below photos show the gym before the project started.

Ceiling before painting

Ceiling before painting

The ceiling and rafters will require some special equipment to reach. An electric lift and scaffolding will be brought in for the project.

Red Color Change

Red Color Change

The original color of the stripes and accents were a maroon, the project will be updating this to a brighter shade of red.

Project in Progress

Pictures taken while the project was in progress.

Scaffolding Used

Scaffolding Used

Some parts of the gym were painted using a scaffolding set up, others we used an electric lift.

Floors covered

Floors covered

This picture shows the prep involved with protecting the floor while walls and ceilings are being painted

Dryfall Ceilings

Dryfall Ceilings

This photo give good perspective of the height of the room and the dry fall ceilings

THE FINAL RESULT

When the project was completed, CertaPro’s professionals surveyed the area and took images of the newly painted gym.

High Gloss Floor & Red Striped Walls

High Gloss Floor & Red Striped Walls

The red stripe is part of a district initiative to have continuity in school colors.

After Painting

After Painting

The project took about 5 days from start to finish. The gym looks much brighter and more modern.

Electric Lifts

Electric Lifts

This photo shows the electric lift that was used to paint sections of the ceiling and rafters.