De Pere Fire Department Station Case Study

Our team had the opportunity to work on the Fire Department Station #1 in De Pere, WI. The project consisted of a painting phase and concrete coating phase. The first phase —painting phase, took an approximate of 4 days to complete. The concrete coating portion of the project took 6 days to complete. The painting phase consisted of an interior update of the ceiling, overhead doors, service doors, and walls. The ceilings were painted with Sherwin-Williams color White. The interior walls were painted with Sherwin-Williams Argos SW7065. The overhead doors and service doors were painted with Sherwin-Willams Safety Red. After the concrete coating was completed we applied floor paint colors: Citadel Nightfall and Citadel Safety Red.

The project needs to completed before the fire station’s open house. All fire trucsk and appartus had to be parked outside during the project to not hinder our team from a full interior coverage. The project involved constant communication between the Job Site Supervisors, CSAs, and our Production Manager with the Chief and Battalion Chief. Each surface received a protected coating layer.

  • Celings – All ceilings were sprayed with Sherwin-Williams DryFall
  • Walls – Coated with Sherwin-Williams Pre-Catalyzed Epoxy
  • Doors – Were painted using Sherwin-Williams Direct-To-Metal (DTM) Acrylic

Special Equipment:

There were two different floor grinders used —220V and Propane along with hand grinders.

 

Wide View of Final Result

In Progress Look at Our Floor Grinder

Before Photos

The fire station before the renovation. Click an image to zoom in.

Before the New Floor Update

Before the New Floor Update

Former Stripes and Floor Condition

Former Stripes and Floor Condition

Interior Walls Before Repaint

Interior Walls Before Repaint

Interior Ceiling Before Repaint

Interior Ceiling Before Repaint

In Progress Photos

Here is an in-progress look at our team working on the project. Click to zoom in.

Team Using the Floor Grinders

Team Using the Floor Grinders

Our team working hard on grinding the floor in preparation for the floor coating.

In-Progress Interior Painting

In-Progress Interior Painting

Our team using the boom lift to paint the interior ceiling.

Interior Painting Preparation

Interior Painting Preparation

Our team prepping for an interior painting

In Progress Exterior Painting

In Progress Exterior Painting

Our team was also tasked to repaint the exterior of the station as well.

Video of Our Propane Floor Grinder

Final Photos

The final results after completing the project. Click an image to zoom in.

Close Up of Floor Coating

Close Up of Floor Coating

Red Safety Strips

Red Safety Strips

Wide View of Final Result

Wide View of Final Result

Interior Walls, Doors, Ceiling, and Floor Updated

Interior Walls, Doors, Ceiling, and Floor Updated

Another Look at the Final Result

Another Look at the Final Result

Walls and Strips Repainted

Walls and Strips Repainted

Walls and Strips Repainted

Floor Coating Complete

Floor Coating Complete

Exterior Painting of Fire Station

Exterior Painting of Fire Station