The CertaPro Painters® team from McHenry, IL was commissioned to refresh the interior of a school located east of Belvidere in Garden Prairie. The scope of work included painting the interior and conducting minor repairs on cinder block walls. The school was generally well-maintained, requiring only a few minor fixes before the painting could begin. Despite the ongoing classes and flow of students in the halls, the project was efficiently completed in a standard two-day timeframe.

View a selection of images from the project below.

Before

Before

Double doors in some areas were improperly primed, leading to paint chipping.

Before

Before

Walls of the school also had chipped and cracking paint from years of hanging decorations.

Before

Before

Areas throughout the hallways had scuffs and other marks from years of wear and tear.

During

During

Paint had to be scraped off the old doors before proper priming could be applied.

During

During

Our team painted the double doors while students were not in the hallway.

After

After

Hallways in the school were painted like new, and cracks were repaired

After

After

Walls throughout the building were freshly painted, around every corner.

After

After

After completion of the project, the students can enjoy a bright and clean school environment.

cropped after image of a finished commercial painting project of a school in IL

PROJECT INVOLVEMENT:

The school facility was generally well-kept, but there were specific areas that needed attention before painting could begin. Cracks in the walls had to be repaired. Some sections of wall had chipping and scuffed paint, likely due to years of hanging posters and other decorations for the students. Additionally, old doors in the building had been improperly primed, causing paint chips to fall off.

Cracks were filled, and paint was scraped from the old double doors. When debris was cleared, our team got to work on the final paint application.

CHALLENGES:

This project had some unique challenges, primarily because the school was in session during the job. Our team had to operate while students were attending classes, which required careful planning. High-traffic areas had to be sectioned off to ensure the safety of students and staff, and traffic flow had to be diverted to alternative routes to accommodate the ongoing work. Additionally, maintaining cleanliness was a priority to prevent debris from being tracked into other areas of the school.

THE FINISHED PRODUCT:

Our expert painting team performed the repairs and repainted sections without issue. Students and staff were not disrupted by the work. The finished product is a clean paint job, contributing to a positive learning environment for the students.

PROJECT TIMELINE: 2 days