Our painting contractors have the skill and experience you need to update any commercial space. Recently, our team was contacted by Flynco Construction to renovate three of Central Arkansas Christian Schools campuses in Little Rock and two campuses’ in North Little Rock. You can learn more about this painting project below.

School Classroom

CHALLENGES:

The challenges of this project included working on tight timeline, working around ceiling grid contractor, flooring contractor, electricians updating all the lighting, data technicians moving data cables and installing new smart boards, and custom color matching purple lockers for the purple accent walls color.

CONDITIONS:

We worked on three different campuses. Secondary Campus (high school), Pleasant Valley Elementary, and NLR Elementary. The size of all three location put together would somewhere around 70-80 total square feet under roof. We painted around 70 classroom and about 1400 feet of hallways between all three campuses. All ceilings were drop in ceilings. The building was a little dated when we started the work. It had your typical damage to the sheetrock walls that required skim coating and mud work to repair the damaged areas. As for the block walls most of those were in decent shape, and mostly needed some caulking on old holes and cracks in the blocks. The colors were a yellow/tan color on most of the walls. Lighting and flooring was also out dated.

PROJECT INVOLVEMENT:

The project involved working on a very tight schedule in order to get all the work done before school started. We painted walls, sprayed acrylic dryfall on all ceiling grid, painted metal door frames, and painted some cabinets. In most all of the classrooms three of the wall would be a light gray color and one wall would be a purple accent which is the schools colors. In the hallways, one side of the hallway would light gray while the other darker gray with some purple accents thrown in there as well.

PROJECT TIMELINE – Started: Summer 2021 Duration: 10 Weeks

Before Photos

Before our painters started this project, the paint was dated and in need of a little TLC.

Hallway Before

Hallway Before

Here is what the hallway looked like prior to painting.

Classroom Prior to Painting

Classroom Prior to Painting

The classrooms were in need of a makeover before school started.

Classroom Before

Classroom Before

The paint was faded and in need of repair.

School Painters

School Painters

Our painters renovated multiple classrooms.

Dated Hallway

Dated Hallway

We also added a pop of color to school hallways.

In-progress Photos

Starting the Project

Starting the Project

This was at the start of the school painting project.

Hallway Repair

Hallway Repair

We refreshed the walls and added the school colors in some places.

Bathroom Refresh

Bathroom Refresh

We also painted the bathrooms at the school.

After Photos

We finished painting the school just in time for the new semester to start. Check out the final results below.

Storage Room

Storage Room

We painted the cabinets and walls in this interior space.

Newly Painted Classroom

Newly Painted Classroom

The freshly painted classrooms are a great place for students to learn.

School Entrance

School Entrance

Here is one of the school entrances.

Locker Wall

Locker Wall

The lockers really pop now that they have a new coat of paint.

Hallway After Painting

Hallway After Painting

This is an example of one of the hallways after we finished painting.

Teachers Lounge

Teachers Lounge

We even renovated the teachers lounge.