Commercial Case Study

Schuylkill River Greenways

Ready to make a change?

Schedule an Estimate

Problem To Be Solved:

Triple Crown Corporation came to us in May 2021 to paint their Colonial Golf & Tennis Club swimming pool. The cement around the pool was damaged from years of use. The black lines inside the pool were faded. Numbers were also needed around the pool to help provide pool guests with important information.

Problem Solver Solution:

For this project, our goal was to repair the pool while updating the paint. When we began the project, we began with power washing to remove any dirt from the surface. After power washing, we started repairing the cement. To create the lines and numbers, we used stencils to ensure they were all accurate and consistent.

Final Result:

The project took four days to complete. In the end, the pool cement was repaired and the lines were repainted. The client was happy with the resulting transformation.

Schuylkill River Greenways - Before

Schuylkill River Greenways - Before

Schuylkill River Greenways - After

Schuylkill River Greenways - After

Schuylkill River Greenways - Before

Schuylkill River Greenways - Before

Schuylkill River Greenways - After

Schuylkill River Greenways - After

Schuylkill River Greenways - Before

Schuylkill River Greenways - Before

schuylkill-river-greenways-bridge-after-2

schuylkill-river-greenways-bridge-after-2