Commercial Project Highlight

Royersford Spring Company

Ready to make a change?

Schedule an Estimate

In this case study, we recap a commercial painting project that took place in July of 2022 for the Royersford Spring Company. We detail the highlights from this project below:

Describe the condition of the facility/surfaces at the time work began.

Parts of the tower were very rusty and required a lot of sanding. Parts of the tower were also corroded and required a welder (which the company took care of).

What did the project involve? 

  • Scrape/electric sand entire tower
  • Prime w/ metal primer
  • Paint with DTM

How long did the project take, start to finish?

The project was completed in one week.

Were there any special challenges involved?

We needed a boom lift since the area we had to get to was very narrow. The weather was a challenge, but thankfully it only rained once and did not cause a delay in production.

Did the project require any special equipment or techniques?

We needed to use a boom lift.

Exterior Vent (Before)

Exterior Vent (Before)

Tower (Before)

Tower (Before)

Worker inspecting tower

Worker inspecting tower

Tower (During)

Tower (During)

Exterior Vent (After)

Exterior Vent (After)

Tower (After)

Tower (After)

Tower (After)

Tower (After)

Tower (After)

Tower (After)