Condominium Center Exterior Painting

in Fairfax and Prince Williams

Ready to make a change?

Schedule an Estimate

Condominium Center Painting

CertaPro Painters® of Fairfax and Prince William had the opportunity to work on a commercial exterior project in Reston, VA. Our team had to prepare and paint the exterior trim of a large condominium community. The project consisted of painting the exterior trim of nine total buildings, fourteen carports, and the community handrails & fences.

Final Result of the Exterior Building Painted
Final look at the exterior siding and trim repainted.

CHALLENGES:

Large commercial projects provide their own set of challenges. For this project, this property presented a few unique challenges that we had to overcome. The first one was that we had limited access to water for the power-washing portion of the project. The property only had a few working spigots, so we had to bring in a mobile 500-gallon water tank to properly power-wash the buildings that had no water access. Another challenge we faced was having to traverse a lot of uneven terrain with our lifts, especially at the backs of the buildings. For this, we had to formulate a plan of how we were going to approach accessing some of the more challenging terrains with the lifts. We ended up meeting with our lift representative and he not only helped us choose the correct lifts for the project but also helped us map out the correct entry and exit points for the lifts to avoid any safety issues. The other challenge was coordinating with all of the community residents the timeline for moving their vehicles in order to access the carports in order to paint these areas. We had our Commercial Project Manager work closely with the community’s Property Manager to give daily and weekly updates alerting the residents of our painting schedule and which days they would need to move their vehicles. We made sure to always be available to answer any questions that the residents or property manager had about the project plan.

CONDITIONS:

  • Power Wash – The community had not been power-washed or painted in over 20 years and was in dire need of a refresh.
  • Peeled Paint – The majority of the surfaces had peeling paint and had severely faded over time.
  • Repairs – There were also multiple trim sections on each building that had to be replaced due to rot from moisture. The metal components on the carports had a lot of surface rust that needed to be removed.

PROJECT INVOLVEMENT:

This project involved power-washing, preparing, and painting the exterior wooden & metal trim of the buildings and carports. The components on the buildings included the wooden fascia, T1-11 siding, utility doors, door frames, window frames, & hand rails. The components on the carports included the wooden fascia, T1-11 siding, interior plywood walls, metal I-beams, and metal posts. We also painted the community’s privacy fence, recycling area fence, and parking lot hand rails.
We spent a lot of time scraping and sanding loose and peeling paint on the wooden components, as well as grinding surface rust from the metal components before we were able to paint. We also had to repair or replace quite a few of the exterior wood components due to rot and moisture from exposure to the elements. We spot primed all the repaired and sanded surfaces before applying a high quality paint that was designed for longevity.

SPECIAL EQUIPMENT:
  • Water Tank – This project required the use of a 500 gallon mobile water tank to properly pressure wash all of the buildings due to the community having limited or no water access for most of them.
  • Boom Lift – 40′ and 60′ Boom lift in order to access the upper areas.

PROJECT TIMELINE – 2 Months

Before Photos

Below are a few photos of what the building looked like prior to painting. Click on any image to view.

Before Photo of Side View

Before Photo of Side View

Before look at the side view of the condominium building.

Before View of Bay Window

Before View of Bay Window

Before look at the Bay Window and Trim.

Before View of Front Fascia

Before View of Front Fascia

Before look at the state of the front side fascia.

Before View of Back Rail

Before View of Back Rail

Before look at the back rail.

Before View of Back Side Soffit

Before View of Back Side Soffit

Before look at the back side soffit.

Before Look at Back Doors

Before Look at Back Doors

Before Look at the back doors of the condominium.

Before Back View of Siding

Before Back View of Siding

Before back view of the T1-11 siding

Before View of Back Bay Windows

Before View of Back Bay Windows

Another view of the back bay windows and trim.

Before View of Handrailing

Before View of Handrailing

Before look at the handrailing.

Before View of Trash Fence

Before View of Trash Fence

Before look of the fencing around the trash bins.

Another look at the Trash Fence

Another look at the Trash Fence

Another view of the trash fence.

In Progress Photos

See the below pictures to view our work in progress.

Close Up on Boom Lift

Close Up on Boom Lift

Close up look at our 60' boom lift.

Boom Lift for Bay Windows

Boom Lift for Bay Windows

View of our boom lift that we used to paint the bay windows.

Another Angle of the Boom Lift

Another Angle of the Boom Lift

Here is anothe view of our team using the boom lift for painting.

Using 60' Boom Lift

Using 60' Boom Lift

This is a view of our 60' Boom lift.

40' and 60' Boom Lift

40' and 60' Boom Lift

Our team using both the 40' and 60' boom lift.

Two Boom Lifts

Two Boom Lifts

Our painters working hard on both boom lifts to paint the exterior.

Painter Working on Boom Lift

Painter Working on Boom Lift

One of our painters working hard on painting the fascia trim.

Another Look at the 40' Boom Lift

Another Look at the 40' Boom Lift

Another angle of the 40' boom lift in use.

Final Results

After completion, areas of concern were surveyed and pictures were taken to validate the quality of work.

Repainted T1-11 Siding

Repainted T1-11 Siding

Final view of the T1-11 Siding.

Carport Repainted

Carport Repainted

The carport was repainted to match the siding.

Final Result of the Exterior Building Painted

Final Result of the Exterior Building Painted

Final look at the exterior siding and trim repainted.

Final Result of Door Frame

Final Result of Door Frame

The door frame was repainted to match the trim.

Front View of Fascia

Front View of Fascia

Final results of the fascia repainted.

I-Beam Painting

I-Beam Painting

The supporting beams were painted to match the trim.

Another view of the I-Beam

Another view of the I-Beam

The beams repainted.

Carport Plywood

Carport Plywood

Final results of carport plywood repainted.

Bus Stop

Bus Stop

The bus stop siding was also repainted.

Interior of Bus Stop Space

Interior of Bus Stop Space

Both the exterior and interior of the bus stop was repainted.

Fencing Repainted

Fencing Repainted

Trash fences were also repainted to match the exterior of the building.

Carport Fascia

Carport Fascia

Final look of the carpot fascia repainted.

Bay Window Side Repainted

Bay Window Side Repainted

Trim and Siding painted to match the building.

Triple Window Trim

Triple Window Trim

Trim on the triple windows were also repainted.

Back View of Soffit

Back View of Soffit

the back view of the soffit was painted to match the fascia.

Back Rails Painted

Back Rails Painted

Final result of the back rails painted.

Hand Rail Painted

Hand Rail Painted

Hand Rail painting

Trash Fence Painted

Trash Fence Painted

Final result of the trash fence painted.

Another View of the Trash Fence

Another View of the Trash Fence

Final result of the trash fence.

Hand Railing After View

Hand Railing After View

Final Result of Hand Railing

Close Up of Window Trim

Close Up of Window Trim

Close up view of the brown window trim painted.

Back Doors

Back Doors

Final result of back doors.

Back View of T1-11 Siding

Back View of T1-11 Siding

Final result of T1-11 siding on the back view of the condos.

After Photo of Side View

After Photo of Side View

Another view of the building siding repainted.

Final Result of the Carpot

Final Result of the Carpot

Carport siding, trim and plywood interior were all repainted.

Back Bay Windows

Back Bay Windows

Final Results of the bay windows trim and siding repainted.