Underground Parking Garage Repaint in Alexandria, VA
by CertaPro Painters of Fairfax & Prince William
Functional & Fresh: Parking Garage Restoration
In March 2025, CertaPro Painters took on a multi-faceted commercial repaint project at an assisted living facility in Alexandria, Virginia.
The focus of the project was the facility’s underground parking garage, which had not been repainted in over 15 years.
With extensive surface damage, failing coatings, and overall dinginess, the client sought a complete refresh that would improve both appearance and functionality for residents and staff.

SCOPE OF THE PROJECT:
Over the course of the project, our team repainted approximately 39,000 square feet of walls, columns, and structural components throughout the garage.
The scope of work included concrete block and drywall walls, concrete columns, metal air vents, I-beams, bollards, parking bumpers, and various doors and frames.
PROJECT INVOLVMENT:
Several repairs were required before painting could begin. We performed drywall ceiling repairs where past water leaks had caused damage and skim coated two concrete block walls to create a smooth Level 5 finish, preparing them for future murals.
The metal I-beams presented another challenge: old, peeling paint had to be completely scraped away before proper priming and painting could ensure long-term adhesion and durability.
We applied two fresh coats of paint across the space to significantly brighten the environment and also added color-coded wayfinding stripes on the columns to help distinguish different parking areas—enhancing both aesthetics and usability.
SPECIAL TECHNIQUES:
Because this was a functional, in-use parking garage, careful coordination was key. We developed a detailed production plan with a visual timeline that outlined which parking spaces would be temporarily closed each day.
Using cones and caution tape, we safely navigated around daily traffic and parked cars while maintaining strong communication with the facility staff to keep residents informed throughout the project.
PROJECT TIMELINE:
This project was completed in five weeks.
Before
Below are photos of the parking garage before our team began work. Click on any photo to zoom in.
The Results
The result is a clean, safe, and welcoming garage environment that aligns with the facility’s high standards.
SCOPE OF THE PROJECT: