The Problem:

In April 2020, we executed a project Westover United Methodist Church in need of interior painting and ceiling repairs. Several Rooms had lots of wall and ceiling cracks.

Our Solution:

The wall painting involved some repairs due to plaster cracks and general wear and tear before any painting started. The Sanctuary ceiling needed some repairs due to previous water intrusion and chips that had flaked off. The high ceiling (30-35 feet) required special lifts and jacks to complete the job.

Final Result:

We executed the project in a timely manner, completing it in 10 consecutive days, excluding Sunday.