Multi-Building Apartment Complex Painting Project

Commercial Painting Projects in Boulder, Longmont & Surrounding Areas

Ready to make a change?

Schedule an Estimate

Multi-Building Apartment Complex Painting Project in Boulder, Colorado

A multi-building apartment complex in the southern part of Boulder, Colorado needed a new paint job. The facilities have been on a regular maintenance cycle, so the facilities had the normal signs of needing a repaint. As our team at Certapro Painters of Boulder and Longmont are experienced with apartment painting projects, we knew this one was was going to require professional coordination between our team, the owners and tenants.

Extremely happy with the work done. They really went the extra mile to make sure that our paint job was not only beautiful, but also of the highest quality. Great attention to detail. The site was clean after each day and the follow up after the job was terrific.

- Mike T.

Mike T.

Get a Free EstimateBack

CHALLENGES:

Our crew needed to adhere to a strict protocol and process around cleaning the job site daily and creating a moving workstation. Our team kept things orderly, clean and presentable while utilizing a large crew to complete the work in a short time frame for the customer.

Extensive and detailed masking was required. The team taped off gutters, downspouts and roof line metal flashing. There was also thin metal flashing over siding panels, door frames and window trim that required intricate masking.

Our crew coordinated with residents and the property manager regarding communication, logistics and timing to paint their doors while open.

CONDITIONS:

Facilities have been on a regular maintenance cycle, so the facilities had the normal signs of needing a repaint. In general, the condition was good. This allowed our team to keep the cost lower since there was not an excessive amount of surface preparation necessary.

PROJECT INVOLVEMENT:

  • Full exterior repaint.
  • Power wash, preparation and paint.
  • Detailed work including metal railings, front and back doors of each unit.
  • Clapboard siding with some masonry siding, as well as stairwells.

PROJECT TIMELINE

Started: September/October 2018 and August 2019
Duration: 6 weeks in total

BEFORE PHOTOS

Facilities have been on a regular maintenance cycle, so the facilities had the normal signs of needing a repaint, but in general the condition was good.

Rusty Run Off

Rusty Run Off

Bubbling Exterior Paint

Bubbling Exterior Paint

Failing Railing Coating

Failing Railing Coating

Multi-Building Apartment Complex - Before Photo

Multi-Building Apartment Complex - Before Photo

Boulder, CO

THE FINAL RESULTS

The apartment complex looks brand new!

Front and Back Doors of Each Unit

Front and Back Doors of Each Unit

Full Exterior Repaint

Full Exterior Repaint

Metal Railing

Metal Railing

Finished Exterior

Finished Exterior

Meet the Commercial Team

Stephen Strayer and Jessica Mackie assist commercial customers of CertaPro Painters® of Boulder and Longmont find the right solutions for their businesses. They’re both passionate about helping local businesses and they understand the unique needs that business owners have. Please click on the links below to contact Stephen or Jessica and to learn more about their background.

Stephen Strayer
Email: [email protected]
Profile: https://certapro.com/boulder/our-team/stephen-strayer/
Phone: 720-400-8872

Jessica Mackie
Email: [email protected]
Profile: https://certapro.com/boulder/our-team/jessica-mackie/
Phone: 970-294-2340

Stephen and Jessica