The center was built in 2013 so was in good condition before painting. Some of the exterior doors had some damage at the bottom so kickplates were installed. The double entrance doors in the back and front were originally stained and were very faded from the sun. The community opted to have them painted for a more durable finish. After a thorough power wash, the crew needed to move a large tank away from the building to allow access. There were no needed repairs before painting. The building had one siding color and 2 trim colors.