Brewery Flooring Case Study

A Case Study By CertaPro Painters® of Palatine, IL

Ready to make a change?

Schedule an Estimate

Transforming the Bottling Floor at Pilot Project Brewing: A Seamless Restoration

At CertaPro Painters, we excel in delivering exceptional results, even under challenging conditions. Our recent project at Pilot Project Brewing in Milwaukee, WI, demonstrates our ability to partner with clients in crafting innovative solutions while maintaining their operations. Tasked with restoring the bottling floor to withstand constant water runoff, our team applied urethane cement coatings and concrete repairs without disrupting the brewery’s production schedule.

Pilot Project Brewing main floor freshly layed

About the Project

  • Client: Pilot Project Brewing
  • Location: Milwaukee, WI
  • Year: 2024
  • Project Scope: Bottling Floor Urethane Cement Coating

Background:
Pilot Project Brewing enlisted CertaPro Painters to repair and enhance the bottling floor of their facility. Frequent exposure to water runoff had eroded the concrete, this resulted in the need for durable urethane cement coatings to protect the floor and ensure long-term functionality. In addition to coating the floor, our team repaired embedded concrete drains to address damage and optimize performance.

Unique Challenges:

  • Conveyor Belts: The bottling floor’s conveyor belts, essential to production, were hoisted into the air during repairs. This required precision and careful coordination to work around the equipment without causing disruptions.
  • Production Schedule: To eliminate production losses, our crews worked exclusively during downtimes, adhering to a tight schedule while maintaining high-quality standards.

Results:
CertaPro Painters successfully completed the project on time and within budget. The bottling floor now boasts a pristine, durable surface capable of withstanding constant water exposure. By meticulously navigating unique challenges, including conveyor belt adjustments and production constraints, we ensured Pilot Project Brewing experienced no downtime during the project.

Before Images

Below are images of the project before we started. Click to enlarge.

Pilot Project Brewing Before Photo

Pilot Project Brewing Before Photo

Pilot Project Brewing Before Photo

Pilot Project Brewing Before Photo

Pilot Project Brewing Before Photo

Pilot Project Brewing Before Photo

During Images

Below are images of the project as it was taking place. Click to enlarge.

Pilot Project Brewing During Photo

Pilot Project Brewing During Photo

Pilot Project Brewing During Photo

Pilot Project Brewing During Photo

Pilot Project Brewing During Photo

Pilot Project Brewing During Photo

Pilot Project Brewing During Photo

Pilot Project Brewing During Photo

Pilot Project Brewing During Photo

Pilot Project Brewing During Photo

Pilot Project Brewing During Photo

Pilot Project Brewing During Photo

After Images

Below are images of the project after we finished. Click to enlarge.

Pilot Project Brewing After Photo

Pilot Project Brewing After Photo

Pilot Project Brewing After Photo

Pilot Project Brewing After Photo

Pilot Project Brewing After Photo

Pilot Project Brewing After Photo

Pilot Project Brewing After Photo

Pilot Project Brewing After Photo

Other Commercial Services We Provide